2025: Bechtel – Natrium Demonstration Project – Kemmerer Training Center – Kemmerer, WY – Site Preparation, Grading, and Underground Utilities
Innovate. Engineer. Transform.
Earth Work Solutions continues to be a diverse heavy construction company with expertise in many areas and have placed our stamp of craftsmanship on a multitude of projects. We work to maintain a safe and efficient operation to maximize quality and minimize your capital expenditure. See some of our larger projects, below.
2025: Bechtel – Natrium Demonstration Project – Kemmerer Training Center – Kemmerer, WY – Site Preparation, Grading, and Underground Utilities
2024: Bechtel – Natrium Demonstration Project – US HWY 189 Access – Highway widening for access to Natrium Facility
2024: Basin Electric Power Cooperative – Laramie River Station CCR Waste Removal – Excavate, haul, solidify and deposit in a landfill coal combustion residual waste sludge from large-scale process water and ash ponds.
2024: Occidental Petroleum – Eastfield – Construction of a multi-million barrel capacity lined frac pond.
2024: Bechtel – Natrium Demonstration Project – Test and Fill Facility – Site Preparation, Grading, and Underground Utilities
2023: Neah Bay – Repair access road for FAA access to defense system at a remote site in NW Washington.
2023: Wiggins Creek – Remove and replace bridge across Wiggins Creek including abutment construction, channel diversion, and road modifications for Central Federal Lands.
2023: Exxon – Continuous construction projects at the Schute Creek Facility including pond construction, parking lots, underground facilities including firewater lines and storm drains, and civil construction for the carbon capture facility.
2023: Town of Guernsey – Municipal Landfill Cap & Closure – Final closure of the Guernsey municipal landfill.
2023: AML – Jeffrey City McIntosh Final Grading Project – 1.1 million cy of excavation and GPS controlled natural regrade of the abandoned McIntosh uranium mine.
2023: Campbell County – T7 Road Relocation – Construction and paving 4 miles of county road.
2022: Town Pump – Butte Rail Facility – Design & construction of a large-scale rail facility in Butte, MT.
2022: Union Pacific Railroad – Silver Bow Auto Facility Expansion – Grading, aggregate, paving, storm water, and rail work for an industrial auto transload and storage facility.
2022: City of Sheridan – T6/T7/T8 Landfill Cell Cap & Closure – Closure of three cells of the Sheridan municipal landfill.
2022: Town of Glenrock – Municipal Landfill Cap & Closure – Final closure of the Glenrock county landfill.
2021: Town of Wright – Wastewater Treatment Plant Lagoons – Expansion of wastewater treatment plant including two new lined lagoons, reconstruction of two existing lagoons.
2021: Big Sandy Reservoir Dam Reconstruction – Three year irrigation district project for reservoir embankment repair for the Bureau of Reclamation.
2021: Port of Montana – Rail Facility Expansion – Construction of additional rail facilities for Union Pacific Railroad and the Port of Montana in Butte.
2020: Wyoming Department of Transportation – Highway 59 Widening & Passing Lanes – Construction of passing lanes along thirty miles of Highway 59.
2020: Devil’s Tower National Monument – Visitor’s Center Parking Lot and Walking Path Reconstruction
2019: Expedition Water Solutions – Bronco Produced Water Disposal Facility – Construction of a new COWDF facility with eight, half million barrel lined produced water ponds and loadout facility.
2019: Anadarko Petroleum – Dora & Big DW Reservoirs – Construction of large lined freshwater storage reservoirs and loadout facilities to support fracking.
2019: AML – Shirley Basin Little Medicine Bow River Grade Controls – River channel modification and installation of boulder grade control structures on 4 miles of the Little Medicine Bow River.
2018: Wyoming Department of Environmental Quality – High Plains Gas Reservoir Reclamation – Reclamation of sixty-two reservoirs in Campbell and Johnson Counties.
2018: Meritage Midstream – Steamboat – Design & construct a 40-acre facility pad along with super-access road to accommodate heavy load access for the natural gas compression process.
2018: Evolution – Jewell – Design & construct a facility pad for the natural gas compression process.
2016: Bluegrass Water – Oilfield Produced Water Disposal – Southern Cross and Wright Facilities – Construct single produce water pond and install lining in Baggs, WY. Design – Build six ponds at the Wright facility. To-date we have completed the construction of four of the produced water ponds and the installation of the production and evaporation system.
2016: S&S Builders – Gillette College Agricultural Complex – Site grading, road construction and utilities.
2016: Upton Development Commission – Transload Facility – Design/Build: Designed and constructed a loop off of the mainline with sidings and storage tracks for multiple customers. We are continuously planning for the growth of the Upton Development Park for an increasing number of new customers.
2016: North Antelope/Rochelle Mine – Circuit 4 Conveyor – Installed several thousand feet of overland conveyor infrastructure to convey coal throughout the NARM Facility.
2016: Enserco – Crude Oil Loadout, Site Improvement & Manifest Loading – Design – Build construction of a new double loop unit train oil loadout facility with a highway crossing and a frac sand loadout.
2016: City of Gillette – Boxelder Road Expansion – General contractor for the extension of the urban arterial.
2016: Contura Coal West – Highway 59 Relocation – General contractor for the relocation of 3.9 miles of Highway 59.
2015: Anadarko Petroleum – Hilight Plant Track Expansion Design – Build major track expansion for the gas facility.
2015: Simon Contractors – Hwy 112 Reconstruction (Hulett North) – Major vertical alignment change, FDR, Culvert extensions and subbase for 9 miles of highway reconstruction.
2015: Anadarko Petroleum – Hilight Plant Track Expansion – Design – Build major track expansion for the gas facility.
2015: Campbell County – Landfill Phase III West – General contractor for the construction of a new landfill cell.
2015: Hladky Construction – Farmers Co-op Site – Site grading and utilities for the construction of a new fuel station and travel center.
2015: Owl – Thunder Basin, Ponds 8 & 12 – Earthwork construction for of two produced water disposal reservoirs.
2015: North Bill Disposal – Oilfield Produced Water Disposal Facility – Earthwork construction of four produced water disposal reservoirs.
2014: Balfour Beatty – Laramie River Station Track Expansion – Design – Build new siding for additional coal storage.
2014: Meritage Midstream – 50 Buttes Compressor Pad
2014: City of Sheridan – Landfill Project – General contractor for the construction of a new landfill cell.
2014: SBG Energy – Richardton, ND Transloading Facility – Design – Build new transloading facility for pipe, oil and frac sand.
2013: Westmoreland Resources – West Wye Track Expansion – New mainline wye track to connect to the BNSF line. Construction was across a major highway and wetlands.
2012: Intermountain Construction – Northern Drive Phase II – New construction of five miles of urban arterial.
2012: Town of Wright – Riding & Roping Facility – General contractor for the site grading, utilities and surfacing for a new facility.
2011: AML Kemmerer, Wyoming– Reclaiming several mines along a 25 mile stretch of the historic mining district. Includes subsidence stabilization, open portal closures with bulkheads, drainage reconstruction and remediation, and several cultural and historic preservation projects as well. Final grading and revegetation is included in this contract.
2011: AML – Cokeville, Wyoming – Close several abandon mines on an annual contract.
2011: Highway 50 – Reconstruct Highway 50 from Lakeway Drive to Highway 14-16 – Excavate 400,000 CY from the existing road template, widen and realign vertically.
2011: Basin Electric Ash Cell Construction – Embankment, excavation, pond construction and road construction for the operation of the Ash Landfill.
2011: Cloud Peak Energy – Belle Fourche Diversion – General contractor for the installation of the largest drop structure in North America.
2011: Keyhole State Park – Waterline and Pumps – Install new pump control, pumps and waterlines throughout the state park.
2011: Nelson Brothers – Major Yard Expansion – Design – Build: Realigned multiple tracks and reconfigured their method of operation. Added three new storage tracks.
2010: Campbell County Landfill Expansion Phase III East – Excavate additional waste containment cell and line with a complex impermeable geosynthetic liner system.
2010: AML Douglas, Wyoming – Closure and reclamation of several abandoned coal mines.
2010: AML – Carney Mine Subsidence Mitigation – Repaired hundreds of closed subsidence areas and several open subsidence areas. Natural Regrade and revegetation of 45 acres of disturbed area.
2009: Spring Creek Coal – 150 Car Track Expansion – Design – Build: Expand existing infrastructure to accommodate three 150-car trains.
2009: City of Gillette – Burlington Diversion – Design/Build: Design diversion to allow storm water by-pass to Burlington Lake.
2009: Campbell County – Landfill #1 – Design/Build: Excavate and map the amount of cover over existing landfill liner, soil sampling and reclamation recommendations to neutralize acidic soils and remediate.
2008: Black Thunder Mine – Hilight Road Realignment and Paving Project – Design/Build: Realign 1 mile of the Hilight County Road and pave.
2008: Cordero/Rojo Mine – North Track Expansion – Design/Build: Extend existing facility to accommodate 150 cars.
2008: Black Thunder Mine – NW Hilight Facility Construction – Design/Build: Loop and storage yard to accommodate new loadout facility. Capable of handling six 150-car trains and high speed loading.
2009: High Plains Community Church – Utilities and Site Grading – Perform all utility and site grading for the new 32,000 sf facility.
2025: Converse County – Chalk Buttes & Ridgewater Road Reconstruction – Culvert replacement, reconstruction, aggregate, and paving 3.5 miles of county road.
2007: Black Thunder Mine – Overland Conveyor – Embankment, excavation and scoria surfacing of two miles of overland conveyor corridor for the new conveyor installation.
2007: Jacobs Ranch Mine – Overland Conveyor – Embankment, excavation and scoria surfacing of two miles of overland conveyor corridor for the new conveyor installation. Included multiple excavations for the truck dump.
2007: Rawhide Mine – 150 Car Track Expansion – Design/Build: Track Expansions to accommodate 150 car trains.
2007: Black Hills Trucking – Track Reconfiguration – Design: Complete modification of existing infrastructure.
2007: Antelope Mine –High Speed Loadout Track Expansion – Design: New loop configuration to accommodate additional silos with high speed loading capabilities. Required complete redesign of the entire rail loop.
2007: North Antelope/Rochelle Mine – Blending Project Loop Expansion – Design/Build: Two new loop tracks to accommodate new high speed loadouts.
2006: Petro Canada Resources – Wild Turkey Project
2006: North Antelope Rochelle Mine – Mega Tank Civil Construction – All grading, containment and piping for the installation of the mine’s million gallon fuel storage facility.
2006: North Antelope / Rochelle Mine – New Access Road – Construct 4.2 miles of new access road across mine reclamation and native areas.
2006: Buckskin Mine – Track Expansion – Design/Build: Double capacity and reconfigured to accommodate 150 car trains.
2006: Coal Creek Mine – Track Expansion – Design/Build: Extend existing facility to accommodate 150 car trains.
2006: North Antelope/Rochelle Mine – Overland Conveyor – Embankment, excavation and scoria surfacing of two miles of overland conveyor corridor for the new conveyor installation.
2005: North Antelope Rochelle Mine – Mine reclamation and topsoil stripping (2.2 million cubic yards).
2004: North Antelope Rochelle Mine – Miscellaneous Reservoir Construction – Constructed seven reservoirs of varying size for pit flood control.
2004: North Rochelle Mine – Reno Road North Relocation and Paving Project – Design/Build: Realign ½ mile of the Reno County Road and pave.
2003: Antelope Coal Mine – Mine reclamation and topsoil stripping (1.5 million cubic yards).
2003: North Rochelle Mine – Mine reclamation and topsoil stripping (1 million cubic yards).
2003: North Antelope Rochelle Mine – Mine reclamation and topsoil stripping (3.5 million cubic yards).
2002: North Rochelle Mine – Mine reclamation and topsoil stripping (1+ million cubic yards).
2002: North Antelope Rochelle Mine – Mine reclamation and topsoil stripping (4 million cubic yards).
2002: North Rochelle Mine – Reno Road Phase I Relocation – Construction 1 mile of Reno Road Relocation to accommodate mine expansion.
2002: North Antelope Rochelle Mine – Wilkinson Reservoir – Construct 120,000 cy of compacted embankment for MSHA Reservoir.
2002: North Antelope Rochelle Mine – Boss Draw MSHA Reservoir – Construct 335,000 CY of compacted embankment for flood control structure.
Have a project in mind? Reach out to us today to start the conversation—our team is ready to discuss your needs, explore solutions, and bring your vision to life.